Black River Overlook
Our Upgrades:
- Our team converted each of our client's 3 apartment buildings to central pellet boilers for heat and a hot water with a LP boiler backup.
- We air sealed and insulated the attics, walls and slab edges.
- Added new windows for insulation.
- Improved ventilation.
Client Savings:
Fuel Costs: 16%
Energy Use: 50%
Air Leakage: 50%
Post-Retrofit Energy Use Metrics (heat & hot water):
5.2 BTU/SF/HDD
45.9 kBTU/SF
$70 per Unit per Month
or 30 gallons oil per unit per month equivalent





BLACK RIVER OVERLOOK, LUDLOW, VT
Owner: Black River Housing Limited Partnership
Developer: Housing Vermont
Architect: S2 Architecture
General Contractor: Naylor & Breen
Dated Completed: October 2015
- 3 buildings
- 22 apartments total
- 23,668 sq.ft.
- Built in 1995
- Our team installed an oil boiler with a DHW tank in each building using 9,300 gallons for both heat and hot water.